Post

mattpocock/skills, Part 3: Spec, Tickets, or More Questions?

Spec, tickets, or a questionnaire? Using per-seat billing, this post maps which gap each of to-spec, to-tickets, triage, wayfinder, and to-questionnaire fills.

mattpocock/skills, Part 3: Spec, Tickets, or More Questions?

In the previous post, I walked you through settling the per-seat billing requirements. CONTEXT.md now records the difference between a “billable seat” and a “member”, and the conversation also settled what happens when a member is deactivated. The next step is to turn those conclusions into work someone can actually start on, but five skills in front of you all look like “planning” skills.

to-spec, to-tickets, triage, wayfinder, and to-questionnaire all produce documents, but each fills a different gap. Pick the wrong one and the AI will still follow the instructions to the end, but all you get is one more document that nobody needs yet. In this post, I go through the original instructions to show which gap each skill fills in this scenario.

mattpocock/skills SeriesPart 3

I based this post on version 1.2.3. I inferred the per-seat billing walkthrough from the original instructions.

mattpocock/skills released 1.3.1 on 2026-10-04 (checked 2026-10-19). All five skills covered here are still there, but 1.3.0 made two changes:

  • It renamed the glossary file this post uses, CONTEXT.md, to GLOSSARY.md; triage and other skills now only read the new name.
  • It moved implement-spec, previously an experimental skill, into the official plugin. It can implement all the split-up tickets in one go, in parallel (see the note in Part 4).

I plan to update this whole series for the new version.

The Four Terms This Post Keeps Using

Most of these five skills revolve around the team’s issue tracker. I’ll be using the following terms throughout:

Term used in this postOriginalMeaning
Issue trackerissue trackerWhere the team records its to-dos, such as GitHub Issues. Each item is a card that can be labeled, commented on, and ordered
SpecspecA document describing what an entire feature should look like
TicketticketA small piece of work cut from a spec that can be completed on its own
SessionsessionOne stretch of work with the AI from start to finish. There’s a limit to how much the AI can handle in one session; once too much content piles up, its judgment becomes less precise

Each of the Five Skills Fills a Different Gap

Regular feature development follows a main path: first clarify the requirements through an interview, then start implementing. to-spec and to-tickets sit on the main path, while the other three skills fill gaps from the side and then merge back:

flowchart TD
  A[grill-with-docs interview] --> B{Fits in one session?}
  B -->|Yes| E[implement builds it]
  B -->|No| C[to-spec writes spec]
  C --> D[to-tickets cuts tickets]
  D --> E
  W[wayfinder maps decisions] --> C
  T[triage sorts reports] --> E
  Q[to-questionnaire asks others] -.->|answers| A
  Q -.->|answers| C

to-spec organizes what was agreed into a spec, and to-tickets cuts the spec into individual tickets. The main flow in ask-matt also requires these two steps to follow the requirements interview and to stay in the same conversation, so the AI remembers what was discussed earlier.

What’s missingSkill to useWhat it leaves behind
The requirements are clear, but not yet written up as a formal specto-specA spec in the issue tracker
The spec hasn’t been cut into pieces that can be completed separatelyto-ticketsA set of tickets with their order marked
Reports from others haven’t been verified and categorizedtriageA category, a status, and a handoff note for the AI
The work is so big you can’t even list all the decisions it needswayfinderA “map” and several open “decision tickets”
The key answer is in someone else’s handsto-questionnaireA questionnaire for that person to fill out

On the left, all five buttons (to-spec, to-tickets, triage, wayfinder, and to-questionnaire) are pressed; on the right, only one path lights up based on the information gap, with a caption at the bottom saying "This isn't a stamp card; you don't need to fill all five slots" Having five names on the same list doesn’t mean you run all of them every time.

to-spec Only Organizes What’s Already Been Discussed

to-spec works from the current conversation and the AI’s understanding of the existing code. Its first rule explicitly tells it not to interview you again, but only to synthesize what has already been discussed. So if the requirements still have open questions, calling it now won’t get you answers; those gaps will simply be carried over into the spec as-is.

Before writing anything, the AI first gets familiar with the current state of the project, reuses the names from the glossary, and respects the decision records left behind earlier (ADRs, introduced in the previous post).

Then it has to decide where you’ll later check whether the feature was built correctly. The original rules favor checkpoints that sit as close as possible to what the user actually does, and as few of them as possible, ideally just one. This step needs human confirmation: the AI first asks you whether these checkpoints match your expectations.

Only after you confirm does to-spec publish the spec to the issue tracker and apply the ready-for-agent label, meaning “the information is complete and it can be handed to the AI.”

The spec has fixed sections: the problem to solve, the solution, user stories, implementation decisions, testing decisions, what’s out of scope this time, and further notes. A “user story” is a fixed sentence pattern for describing a requirement: “As a [role], I want to [do something], so that [I get some benefit].”

The spec doesn’t include specific file paths or code, because those details go stale quickly once the code changes. The only exception: if an earlier prototype contains a small snippet that expresses a decision more precisely than prose can, the spec may quote the most essential part of it.

Short tasks don’t necessarily need a spec. If the whole feature can be finished in this session, the main flow goes straight to implementation.

to-spec Example

Suppose the team has confirmed two things: when a member is deactivated, their seat is reclaimed immediately; and there’s no refund on the current bill, with the reduced seat count taking effect from the next one. Below is an example I wrote of the spec to-spec could turn the conversation into (excerpt):

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
## Problem

Workspace admins don't know when a seat is freed up after they deactivate a member, so they often miscalculate available seats and the billing amount.

## User stories

1. As a workspace admin, I want to see available seats increase immediately after I deactivate a member, so that I can reassign the seat to another member.

## Implementation decisions

- When a member is deactivated, reclaim their seat immediately.
- No refund for the current bill; the reduced seat count is reflected on the bill starting from the next billing cycle.

## Testing decisions

- Simulate an admin deactivating one member and confirm available seats increase by one.
- Confirm the billing system receives the new seat count, marked as effective from the next billing cycle.

## Out of scope

- Prorated refunds based on days of usage are not handled this time.

This spec only contains confirmed answers. If “takes effect from the next bill” hasn’t been confirmed by finance yet, to-spec shouldn’t write it in on the team’s behalf. In that case, I would first use to-questionnaire (covered later) to get the answer.

to-tickets Makes Every Ticket a Small, Complete Slice of the Feature

to-tickets can take a spec, a plan, an existing issue, or just the current conversation. After reading everything, it cuts the work into individual tickets.

The key to how it slices: every ticket has to be a small slice of functionality that works end to end, not one that touches only a single layer. Software features usually span several layers, such as where the data is stored, the code that applies the rules, the screens users see, and the tests that check the feature. A ticket that only changes the data or only changes the UI doesn’t satisfy this rule.

The original rules call this kind of slice a tracer bullet. When firing at night, tracer rounds glow so the shooter can see the trajectory and correct their aim on the spot. In the same way, once a small slice of functionality runs through every layer, the team can immediately see whether it’s heading in the right direction.

On the left, seat assignment is split into four tickets that change only the data, the rules, the UI, and the tests; on the right, a single ticket runs through the UI, rules, data, and tests, and can be verified on its own once done A feature should be cut into small slices that can be completed independently, not split by technical layer into tickets that wait on each other.

The original rules give every ticket two checkable conditions:

  • Once done, it can be demonstrated or verified on its own.
  • It’s small enough to finish in one fresh session.

Each ticket also lists what it’s “blocked by”: other tickets that must be done before it can start; a ticket with nothing blocking it can start right away. The slicing rules and blocking relationships are all written in to-tickets/SKILL.md.

The AI doesn’t publish its first cut directly. It first lists each ticket’s title, what blocks it, and what it makes possible once done, then asks you to review:

  • Is it sliced too coarsely or too finely?
  • Are the blocking relationships really necessary?
  • Should any tickets be merged or split further?

Only after you agree does it publish the tickets, either as files in the project folder or in the issue tracker, depending on the project’s configuration. The publishing rules also forbid it from closing or modifying the original parent issue along the way.

There’s one exception: mechanical changes that ripple across the whole project, such as renaming a field that’s used everywhere. A change like this affects the entire project at once, so it can’t be cut into slices that each work independently. For these, the original rules switch to an “expand-contract” approach:

  1. First let the old and new forms coexist so nothing breaks.
  2. Then migrate usages to the new form in batches.
  3. Finally, after confirming nothing still uses the old form, delete it.

to-tickets Example

The same seat spec won’t be split into four tickets for “change the data,” “change the rules,” “change the UI,” and “write the tests.” One of the tickets could read:

1
2
3
4
5
6
7
8
9
10
11
12
13
# Admins can assign an available seat to a member

Blocked by: Show the workspace's purchased and available seats

## What this enables

After an admin picks an unused seat on the members page and completes the assignment, that member can use paid features, and the available seat count on the page drops by one.

## Acceptance criteria

- [ ] After the assignment, available seats show one fewer.
- [ ] The assigned member can use paid features immediately.
- [ ] When no seats are available, the system rejects the assignment and explains why.

This ticket touches everything from data storage to the UI, but once it’s done it can be demonstrated on its own. The later “Deactivate a member and free their seat” ticket will list it as a blocker, because the system has to be able to assign seats before you can verify the behavior of reclaiming them.

triage Takes On Work That Other People Send In

“Triage” originally refers to sorting patients in an emergency room. Here it means sorting work you didn’t create yourself: problems reported by users, feature requests from others, and, if the project is configured for it, code changes (PRs) sent in directly by outside contributors. Tickets produced by to-tickets already carry the label for handing off to the AI, so they don’t need to go through triage.

Each item gets one category and one status. There are only two categories: bug means something is broken, and enhancement means a new feature or improvement. There are five statuses:

StatusMeaning
needs-triageWaiting for a maintainer to evaluate
needs-infoWaiting for the reporter to provide more information
ready-for-agentInformation is complete; it can be handed to the AI
ready-for-humanNeeds to be handled by a person
wontfixDecided not to address

If an item ends up with conflicting statuses, triage’s status rules require it to flag this and ask the maintainer before doing anything else.

Categorization can’t rely on the report text alone. The full processing order separates verification, follow-up questions, and status updates into distinct steps:

flowchart TD
  A[Read the whole thread] --> B[Check code, past rejections]
  B --> C[Propose category and status]
  C --> D[Wait for the maintainer]
  D --> E[Reproduce, ask if needed]
  E --> F{Result}
  F -->|Can go to AI| G[Leave a handoff note]
  F -->|Needs a person| H[Same format, why not AI]
  F -->|Missing info| I[Confirmed facts, questions for reporter]
  F -->|Already exists| J[Point to it, close]

triage Example

Suppose a user sends in a one-line report: “After deactivating a member, the available seats didn’t increase.” The AI reads it, checks the existing code, and first proposes a category to the maintainer. Once the maintainer agrees, it follows the steps in the report and confirms the problem exists. The organized result might look like this:

FieldContent
Categorybug
Statusready-for-agent
Verification resultAfter deactivation, the member can no longer use paid features, but the seat is still recorded under their name; after refreshing the page, available seats still haven’t increased
Comparison with existing rulesThe seat spec requires the seat to be freed immediately on deactivation, and the project has no decision record overriding that rule
Handoff noteFind and fix the step that fails to reclaim the seat when a member is deactivated; once fixed, deactivating one member should increase available seats by one

If verification shows the system actually does free the seat and only the UI isn’t updating, the handoff note should narrow the scope to the display. If the problem can’t be reproduced from the report’s description, and it’s unclear which plan the reporter used or what actions they took, don’t guess at the cause. Set the status to needs-info first and ask the reporter for more details.

wayfinder Handles the Decisions You Can’t Fully List Yet

Some work is so big that you can’t see the whole picture in one session; you can’t even list which decisions need to be made. As the name suggests, a wayfinder is someone who finds the way.

It first creates a “map” in the issue tracker, recording four things:

  • The destination.
  • The decisions already made.
  • The areas that are still unclear.
  • What’s out of scope this time.

Questions that can already be stated clearly each get their own “decision ticket.”

When a decision ticket is done, what it produces is a decision, not a finished feature. wayfinder’s rules require it, by default, to only plan and not start implementing. Each session resolves at most one decision ticket; the only exception is pure-research decision tickets, which can be handed to multiple AIs to investigate in parallel.

The answer is written as a comment on that decision ticket. Once a decision ticket is closed, the map only gets a one-line summary and a link, and the details stay in the decision ticket. If an answer clarifies an area that was previously unclear, a new decision ticket is opened for it.

If the first pass shows every question is already clear and the whole thing can be talked through in one session, there’s no need for a map. The AI then stops to ask how you’d like to proceed. Once all the decisions on the map are done, the flow returns to to-spec, which gathers the answers scattered across the decision tickets into a single spec and then passes it to to-tickets.

wayfinder Example

Suppose you need to switch existing billing from “per member” to “per assigned seat,” and at the start the team may not even know which decisions need to be made. At this point, you can write up what you can currently see as a map:

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
# Seat billing migration map

## Destination

All existing workspaces switch to seat-based billing, with no double charging and no interruption to paid features during the migration.

## Notes

- New workspaces use seat-based billing from the start.
- Existing contracts keep their original price until renewal.

## Decisions made

(None yet. Each time a decision ticket is closed, add a one-line summary and link here.)

## Still unclear

- How existing members will be converted into seat assignments.
- How to restore the original billing and access permissions if the migration fails.

## Out of scope

- No redesign of pricing plans.

The map itself doesn’t list unresolved decision tickets; those are opened separately in the issue tracker and grouped under this map. Two can be opened for now. One asks how many batches existing workspaces should be migrated in, and when to pause if something goes wrong. The other asks which set of numbers the bill should use while old and new billing run in parallel.

After the first decision ticket is resolved, “how to restore if the migration fails,” originally listed under “Still unclear,” may become concrete enough to write as a question. For example: when a single workspace’s migration fails, under what conditions should it fall back to the old billing method? Only then does wayfinder open it as a new decision ticket and remove it from “Still unclear”; it doesn’t pretend from the start that it has already listed every question.

In the first pass, the map records the destination and the unclear areas, while known questions get their own decision tickets; only after the batch-migration decision ticket is resolved does "when to fall back to old billing if migration fails" become a new decision ticket Decision tickets are opened separately under the map; the answer to one decision ticket may make the next question concrete enough to ask.

to-questionnaire Goes to the Person Who Holds the Answer

Some questions can’t be looked up, and shouldn’t be decided by whoever is in the current conversation. I’ll switch scenarios here: suppose the finance lead hasn’t yet confirmed in which billing period seat changes should take effect. to-questionnaire turns questions like this into a questionnaire that the other person can fill out when they have time, or that you fill out together in a meeting.

It only asks you two things:

  • Who the questionnaire is for, including their role, expertise, and relationship to you.
  • Which answers you need to bring back.

It won’t ask you to answer expert questions on their behalf. After that, it generates a questionnaire file in the current folder, named after the topic, such as to-questionnaire-seat-billing.md.

The questionnaire explains the purpose, the background, and how to answer. Questions are ordered by importance, because the recipient may only fill it out once. Each question asks about just one thing, and the questionnaire ends with “Is there anything we didn’t ask that we should know?”

Only once the answers come back do they become material for grill-with-docs or to-spec, and ask-matt also lists these two flows as where a questionnaire goes next. The questionnaire itself doesn’t make decisions for the project.

to-questionnaire Example

If the answer lies with the finance lead, the generated to-questionnaire-seat-billing.md could include:

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
# Billing rules for seat changes

**Purpose:** Confirm which bill seat increases and decreases take effect from, so the product and the billing system follow the same rules.

**From:** Product lead  **To:** Finance lead

## How to answer

Please reply by this Friday; it takes about 10 minutes. Pick one option per question; if you choose "Other," please add when it takes effect and how it's calculated. For any question you're unsure about, just write "Not sure" instead of skipping it.

## Monthly plans

1. When does billing start after a seat is added?
   - From the moment of assignment, prorated by remaining days
   - From the next billing cycle
   - Other:

2. When does billing stop after a seat is freed?
   - From the moment it's freed, with a prorated refund for remaining days
   - No refund this period; billing stops from the next billing cycle
   - Other:

## Annual plans

3. Which rules for seat changes on annual contracts differ from monthly ones? If they're exactly the same, write "Same."

## Other

4. Is there anything we didn't ask that we should know?

Only after the recipient fills in the answers can the team write conclusions like “no refund this period” into the spec. The options in the questionnaire are there just to make answering easier; they don’t mean the team already leans toward any of them.

They All Leave Documents, but for Different Purposes

All five skills leave text behind. I tell them apart by looking at who each artifact goes to next.

ArtifactContentWho it goes to next
SpecConfirmed requirements and decisions for an entire featureto-tickets, or straight to implementation
TicketA small, complete slice of functionality that fits in one sessionImplementation (implement)
Handoff noteVerification results for an outside report, plus the information needed to pick it upThe AI or the person responsible
Decision ticketOne question to be decided, and the final conclusionFollow-up decision tickets, or to-spec
QuestionnaireAnswers the project is missing that a specific person must providegrill-with-docs or to-spec

Specs and tickets can both carry ready-for-agent, but they differ in size: a spec covers an entire feature, while a ticket is just one small slice of it. Only when a feature is too big to finish in one session does it need to be cut into tickets.

Every Extra Layer of Planning Adds Another Round of Human Review

This process doesn’t skip human review; it moves the review to before the documents are published:

  • With to-spec, you confirm the checkpoints.
  • With to-tickets, you confirm how coarse or fine the slicing is and the blocking relationships.
  • triage makes a recommendation first and then waits for the maintainer’s instructions.
  • to-questionnaire needs you to explain who the recipient is and what answers to bring back.

I think wayfinder takes the most human effort. It breaks work that can’t be talked through in one go into many decision tickets. Each session usually resolves only one, so all that time comes out of the decision-makers’ schedules. If the questions could have been laid out clearly in a single session to begin with, building a map just leaves the issue tracker with a pile of extra items to maintain.

First Look at Where the Information Is Missing

When choosing, I’d start by looking at the situation in front of you:

Current situationNext stepWhat you can skip
Requirements are clear, but it will take several sessions to finishto-spec, then to-ticketsNo need for wayfinder
Requirements are clear, and it fits in one sessionImplement directlySkip both to-spec and to-tickets
You’ve received an unverified report from someone elsetriageNo need to write a new spec first
You can’t even list which decisions need to be madewayfinderDon’t rush to cut tickets yet
A decision needs an answer from a specific personto-questionnaireDon’t let the AI guess the answer

This table only decides where to start right now. Once the skills off the main path fill their gap, they all return to the main path as shown in the flowchart earlier.

Simulated Scenario: Cutting Per-Seat Billing Into Work You Can Start On

I inferred the walkthrough below from the original rules in version 1.2.3; actual results will vary with the project’s content, existing decision records, and the conversation.

Continuing the scenario from the previous post: CONTEXT.md already defines billable seats, members, and seat assignments, and deactivation, assignment, and billing timing have all been confirmed in the conversation. The team estimates that this feature will take several sessions to finish, so, still in the same conversation, they run:

1
$to-spec

The AI first looks at the existing code, then proposes checkpoints. Suppose the team confirms that the best single checkpoint for the entire feature is this: after a seat change completes, the billing system receives the correct seat count. The AI then organizes what was discussed (the problem, solution, user stories, and implementation and testing decisions) into a spec and publishes it once you confirm.

Once the spec is created, pass in its link, still in the same conversation:

1
$to-tickets <spec link>

The AI first lists a draft breakdown, for example:

TicketWhat it enablesBlocked by
Show the workspace’s purchased and available seatsAdmins can see the total number of seats and how many remainNone
Assign an available seat to a memberAfter an admin completes the assignment, the member can use paid featuresShow the workspace’s purchased and available seats
Deactivate a member and free their seatAfter deactivation, the seat is reclaimed and the billing system receives the new seat countAssign an available seat to a member

At this point, I’d suggest checking three things:

  • Whether each ticket can be verified on its own.
  • Whether each fits in one fresh session.
  • Whether the blocking relationships are really necessary.

For example, the acceptance criteria for “assign a seat” require seeing available seats drop by one, so it genuinely has to wait for “show seats” to be done first. Only after you agree does the AI write the tickets into the issue tracker. These tickets already carry ready-for-agent, so they don’t need to go through triage.

During implementation, each ticket gets its own new session; the tickets already contain the information needed, so there’s no need to rely on the earlier conversation.

If finance hasn’t yet confirmed when seat changes show up on the bill, first use to-questionnaire to get the answer from the person responsible, then come back and finish the spec. If you can’t even list up front which decisions the migration period requires, use wayfinder to build a map instead. Different gaps mean different starting points.

I Look for the Gap First Instead of Running All Five

The inputs, artifacts, and timing described above can all be found in the original instructions. What follows is my personal judgment; the source material can’t prove that this approach will always save time.

I start by asking myself: what’s missing right now? A spec, work that’s ready to start, a judgment on an outside report, decisions for a large piece of work, or an answer only someone else knows? Once I’m sure, I pick one skill.

Running all five skills produces more documents, but doesn’t necessarily make the problem any clearer. triage doesn’t need to process tickets you just cut yourself, and work whose questions can already be listed clearly doesn’t need wayfinder. Filling only the gap in front of you each time ensures that every document you produce has a clear next reader.

This judgment applies to team projects that hand off work through an issue tracker, where the work spans several sessions. For a small change within this session, I’d implement it directly.

First Decide Who the Next Document Is For

Once the requirements are talked through, which skill should you start with? I’d look first at who the next document is for, and at what kind of information is currently missing.

Back to the per-seat billing scenario: I think the smallest next step is to stay in the same conversation, run to-spec, and confirm the checkpoints. Then decide, based on the amount of work, whether to cut it into tickets.

Further Reading

  • to-spec: see the spec’s fixed sections, how checkpoints are confirmed, and the publishing rules.
  • to-tickets: check the ticket slicing rules, blocking relationships, and the two ticket formats.
  • triage: learn how reports from others go through categorization, verification, and status transitions.
  • wayfinder: see the map, decision tickets, blocking relationships, and the one-at-a-time resolution flow.
  • to-questionnaire: learn how the questionnaire arranges questions based on the recipient and the answers needed.
This post is licensed under CC BY 4.0 by the author.